Semi-Conductor Chandler Campus

Chandler, AZ

New ground up construction and conversion projects at CH-1/4/5/8. Interior scope of work includes for electrostatic dissipative/conductive resinous flooring, industrial painting, epoxy wall/ceiling painting, chemical resistant floor coatings and heavy duty cementitous urethane systems totaling over half a million square feet. Exterior elements include secondary reinforced lining systems, structural steel high performance painting, water repellents, mechanical/process pipe painting and abrasive media blasting of various substrates.

Services Completed

  • Electrostatic Dissipative/Conductive Resinous Flooring
  • Epoxy Walls and Waffle Decks
  • Secondary Fiberglass Reinforced Epoxy Lining Systems
  • Structural Steel High Performance Painting
  • Abrasive Media Blasting